The operation, which will begin each day from 8:00 AM, will involve a prior inspection of the downstream riverbed by Emasesa personnel to ensure public safety. After the inspection and notification to the Local Police, the outlets will be opened. Personnel will remain at the Tomas de Ybarra bridge until flow rates stabilize.
Residents are urged to exercise caution and avoid any reckless actions that could endanger their physical integrity during these operations.
According to the latest data provided by Emasesa on September 13, 2026, the total volume stored in the reservoirs managed by the water company is 76.9%, with El Gergal reaching 84.5% of its capacity.




