The initiative includes not only the placement of chargers but also the necessary adaptation of electrical panels and cabling centers that will serve these new stations.
The installation of two slow charging stations is planned, each with a total power of 14.8 kW. These units will operate at 230V and will feature battery temperature control systems to optimize the charging process.
This design aims to provide an efficient service tailored to users requiring extended stays at the airport, promoting sustainable mobility.




