The project, promoted by the Council, aims to repair the crossing structure of these routes, which were severely damaged during the DANA (Isolated High-Level Depression) of 2024. The work is funded by the Ministry of Territorial Policy and Democratic Memory, under aid schemes for the reconstruction of municipal infrastructure affected by that episode of heavy rain and flooding.
The roads serve a dual purpose: they provide access to agricultural holdings and form a recreational route frequently used by walkers and cyclists. These routes cross the channel of the Acequia de los Labradores, which runs parallel to the Guadalhorce river in one of the lowest areas of the municipality, receiving runoff water and river overflows during extraordinary rainfall events.
The intensity of the 2024 rains caused a hydraulic collapse of the existing infrastructure, resulting in the breakage of concrete pavement and damage to the road surface. Although Municipal Operational Services carried out a provisional repair, technical reports require a larger-scale intervention. The current 80-centimetre concrete pipe will be replaced by a prefabricated reinforced concrete structure five metres wide and two metres high.
With this solution, the water passage section will be multiplied by twenty, increasing from half a square metre to ten square metres. The aim is to minimise the risk of new overflows, protect surrounding agricultural holdings, and reinforce the safety of people using these roads. The work will also improve the resilience of infrastructure against adverse weather and reduce future maintenance costs.




